Email this article from

Ineos picks builder for new ethane tank at Grangemouth


Ineos Group AG has tapped TGE Gas Engineering GmbH as the preferred supplier to build a new ethane tank at its Grangemouth site in Scotland, in what it terms is the “latest milestone in its 300 million pound ($439 million) survival plan” to import U.S. shale gas to the location.

To send to multiple addresses, simply separate each address with a comma. Example:, Please limit to a maximum of 5 recipients.

Most Popular