Erema North America Inc.'s expansion, more than doubling the size of the facility in Ipswich, Mass., should be completed by late August or early September.
The addition more than doubles the facility's space, and will accommodate a new Intarema 1108 TVEplus with Laserfilter, which will join three existing systems: an Intarema 1108 T and Intarema 1108 TVEplus, each with the SW FTR Erema melt filter, plus an Intarema 605 K.
Erema North America will have 25,000 square feet of space after the expansion opens. The company is a subsidiary of Erema Engineering Recycling Maschinen und Anlagen GmbH based in Ansfelden, Austria.
Tel. 978-356-3771, email [email protected].