The relocation of the KraussMaffei headquarters from Allach to Parsdorf is almost complete. The commissioning is above all the final and decisive building block in the modernization of the almost 185-year-old traditional group. Since 2018, the company has invested a three-digit million euro sum in four new sites in Germany and China.
New KraussMaffei corporate headquarters in Parsdorf: The beginning of a new era
After more than 80 years, the traditional Munich-based company has almost left its site in Allach and is moving to its new headquarters in Parsdorf in the Ebersberg district just outside Munich. Covering over 200,000 square meters, the new site brings together the corporate headquarters, injection molding and reaction process machinery, additive manufacturing, mechanical production and automation, which was previously based in Schwaig. Like the other three new sites, Parsdorf also relies on the Smart Factory concept with modern and sustainable building technology.
CFO and Labor Director of KraussMaffei, Jörg Bremer, classifies the significance of the new location strategy as follows: "Our move to Parsdorf marks the beginning of a new era for KraussMaffei. We are forming a modern, innovative company that accepts the challenges of the 21st century and masters them with flying colors. With the new locations, we are laying the foundation for further successful years."
The new buildings in Parsdorf are at the heart of the Munich-based company's new location and modernization strategy. This includes the relocation of four plants to modern, larger production facilities. Already in operation are the new plants in JiaXing (near Shanghai) and in Einbeck near Göttingen. The relocation of the KraussMaffei Extrusion plant from Hanover to Laatzen has also been successfully completed.
Huge rooftop photovoltaic plant produces up to 12.5 megawatts
In Parsdorf, three production halls, a main administration building, four office and social buildings, two parking garages, a canteen, a cafeteria and a 15,000-square-meter Customer Experience Center are now going into operation step by step. In line with the company's strategy, the new site is designed for efficiency and sustainability. One of the largest rooftop photovoltaic systems in Europe with a maximum output of 12.5 megawatts is being built on the buildings. A large biotope is also being created next to the KraussMaffei site. It balances out the sealed area. Green strips and areas further break up the plant site. The two multi-story parking garages will also be landscaped.
In addition, 140 electric charging stations for e-cars are planned in the first stage, later there will be up to 240. In addition, an energy-efficient heating system will be installed in the halls as well as an active ventilation system and an efficient insulation. For good air quality, the production machines will be better encapsulated and equipped with an extraction system. In the offices, temperatures are regulated according to the season by modern heating and cooling sails.
The entire infrastructure is designed to enable modern and efficient operations for all areas. Short distances between the production areas simplify logistics and thus reduce throughput times in production. In the office buildings, too, the departments are ideally arranged in relation to one another in accordance with the workflows. A modern, open office concept enables better communication between the areas.
Performance show in large Customer Experience Center
One highlight at the new location is the new Customer Experience Center, which covers around 15,000 square meters. Here, visitors are first welcomed in a center set up especially for them. A product and technology avenue, an event area and a flexible auditorium await them there. The area is complemented by a meeting center and a lounge area. From the Visitor Center, visitors can access the various areas, including a TechCenter and training area for reaction process machinery, a technical center and acceptance center for injection molding technology, and a training center for the Digital Services and Solutions Division (DSS). The future of the company is being shaped in a large research and development area.
For more information, visit kraussmaffei.com.
Do you have an opinion about this story? Do you have some thoughts you'd like to share with our readers? Plastics News would love to hear from you. Email your letter to Editor at [email protected]